Co-funded by the European Union

This page collects the public deliverables produced by the PROTON Consortium. The documents provide detailed information on the activities performed and on the results achieved by the project.

D1.1 – Report on factors relating to OC

pdf - 10 MB

This report presents a systematic review of the social, psychological, and economic factors relating to criminalisation and recruitment to organised crime groups (OCGs). It encompasses different types of OCGs, namely mafias, drug trafficking organisations (DTOs), gangs, and a residual category including other criminal organisations.

D2.1 – Report on factors related to terrorism

pdf - 3 MB

This deliverable presents the findings and final reports of all tasks contained within WP2. It includes the first quantitative systematic reviews of the social, psychological and economic factors relating to terrorism and provides the results of the innovative studies of the individual risk factors associated to recruitment and radicalisation.

D3.1 – Report on OC and terrorism in Cyberspace

pdf - 7 MB

This deliverable presents the findings and reports for all task whithin WP3. Each of the six tasks conducted within this work package is presented within a separate section. The systematic review of cyber-related OC and terrorist activities, and technological means for their study forms the theoretical foundation of WP3’s overall goals. The qualitative-quantitative study gives an insight in the social media activities of lone-wolf terrorists and shows possible indicators of the move from radicalization of belief to radicalization of action.

D4.1 – Input (rules/specifications) for PROTON simulations and Wizard

pdf - 2 MB

This deliverable presents the findings and reports for all task within WP4. It consists of three sections. Section 1 includes the report on the internal workshop The meeting was aimed to discuss the results of WP1-3 and the organisation of work leading to the PROTON-S simulator and PROTON Wizard. Section 2 presents the report on the operationalisation of factors into input for ABM simulations. Section 3 comprises the reports for selected experiments.

D5.1 – PROTON simulator and report

pdf - 12 MB

PROTON D5.1 presents two agent-based models (ABMs), one on recruitment in organised crime network and the other on radicalisation and terrorist recruitment. The report presents each model in sequence, addressing the design of the models including their theoretical framework, state of the art, and model overview. It then outlines the calibration, validation, and sensitivity analysis of the models and the policy scenarios and their results.

The PROTON-S models were built in an iterative participatory approach, applying findings from PROTON WP1-3, which included systematic reviews of the literature and provided strong empirical foundations for the models. Selected laboratory experiments have been used to help fill the gaps (see D4.1). Additionally, and unlike many previous ABMs on recruitment into organised crime and terrorism, extensive data are used to calibrate and validate the models. The hypotheses and assumptions underlying the PROTONS simulations are presented below and discussed in detail in the main text of the report.

D5.2 – PROTON Wizard, Manual User Guide & Report

pdf - 2 MB

The aim of this document is to present a technical overview of PROTON’s Wizard for Organised Crime (OC) and radicalization and recruitment to Terrorism (TN) scenarios. Technologies used in the project as well as the purpose of working with them during the development process are described in the following chapters. The document shows the structure of the data that is presented in PROTON’s Wizards which are introduced further in this document. The document also contains a User Manual guide, which contains an introduction to working with OC and TN Wizards.

D5.3 – Report on policy recommendations

pdf - 341 KB

This deliverable presents the reports of T5.3 as part of WP5. It focuses on presenting the policy recommendations based on the results of the PROTON-S simulations. Since the consortium agreed on the development of separate models for the recruitment into organised crime and terrorist networks, the report is divided in two sections.

D6.1 – Ethical and Societal Issues and Safeguards

pdf - 519 KB

This deliverable presents the main activities and preliminary findings of T6.1, on Ethical and Societal Issues and Safeguards. It performs a preliminary ethical and social impact assessment of both the output of WP 1, 2 and 3, and the risk factors for the recruitment in Organized Crime and Terrorism Networks (OCTNs), by pointing out the main risk factors that could be encountered in PROTON project deliverables. Deliverable D6.6 will update D6.1 and will explain how PROTON researchers have mitigated the risks identified.

D6.2 – Legal analysis of the PROTON simulations and PROTON Wizard

pdf - 582 KB

Building on the analysis of previous tasks and deliverables (T1.2, T2.2, D6.1, D6.6, D6.4), the present document aims at evaluating the legal issues related to use of the PROTON outcomes (WP5) by policy makers. The following analysis has been focused on the legal implications of the policies that will be tested using PROTON ABM and Wizard.

D6.3 – ELAG’s mission statement and agenda

pdf - 484 KB

The Ethics and Legal Advisory Group (ELAG) is an independent body that advises the PROTON Steering Committee and the PROTON researchers on specific ethical, social and legal issues raised by the research conducted within the PROTON project.

D6.4 – Interim Societal Impact Report

pdf - 565 KB

The scope of this interim report is not to assess the full range of the societal impacts of PROTON, PROTON-S, and PROTON-Wizard – as they are still in the making –, but to explore their potential consequences from a theoretical and anticipatory perspective, thus allowing the partners involved in the development of PROTON to better identify, assess and manage some of the positive and negative societal consequences associated with the project.

D6.5 – Final Societal Impact Report

pdf - 1 MB

The scope of this deliverable is to provide a Societal Impact Assessment (abbreviated, “SIA”) of PROTON, PROTON-S and PROTON-Wizard. In particular, this deliverable builds on the previous Interim Societal Impact Report (D6.4) in three ways. First, it assesses whether the safeguards and recommendations advanced in D6.4 have been implemented. Second, it integrates the previous interim SIA (D6.4) with the conclusions of the Legal Analysis of the PROTON Simulations and Wizard (D6.2) as well as with the results of other recently produced deliverables (especially D5.1; D5.2; D5.3). Finally, based on this updated analysis, it sets forth the final SIA of PROTON, which includes recommendations in sight of the completion and public release of the project.

D6.6 – Ethical and societal issues and safeguards

pdf - 537 KB

This report analyses the ethical and societal impacts of the risk factors identified by WP1 and WP2 and suggests mitigation strategies that should help the design of the Agent Based Models (ABMs) for Organized Crime and Terrorist Networks (OCTNs). It also analyses ethical and societal impact of Internet research activities carried out by WP3 and provides safeguards with regards to the use of ABM as a simulation tool.

D7.1 – Dissemination and Communication Plan 1

pdf - 599 KB

PROTON communication and dissemination strategy is about increasing the project visibility by raising awareness of its activities in the community of policy makers, public authorities and security scholars and professionals.

D7.2 – Project website

pdf - 2 MB

The deliverable aims at illustrating the planning, design and implementation of the project website for the PROTON project, showing all the intermediate steps that have led to the completion of the task.

D7.3 – Communication Toolkit

pdf - 4 MB

The main objective of the communication tools is to facilitate the recognisability of the PROTON brand and its establishment as a reliable and authoritative subject in the field of organised crime and terrorist networks research.

D7.4 – eNewsletter 1

pdf - 1 MB

The main aim of the PROTON project newsletters is the engagement of the stakeholders community through a periodic interaction with the project’s contents. The present document describes fully the approach and process adopted by youris.com in the planning, production, release and evaluation of the newsletters.

D7.5 – PROTON Video

pdf - 680 KB

This document reports on the production of the final video of PROTON. The goal of the video is to summarise the main outcomes of the project. The production of the video was led by youris.com with support from UCSC, HUJI, CNR and ITTI. The voiceover is in English and the adopted video format is suitable for distribution via the web and during conferences, fairs and events. The video is available on the PROTON YouTube channel and is embedded in the project website.

D7.6 – Conference proceedings of the final EU conference in Ghent

pdf - 3 MB

This report gathers all the documents related to the Final Conference held in Ghent (Belgium), on September 18th 2019. It includes the agenda, the list of participants, the presentations and the minutes of the meeting.

D7.7 – Policy recommendations

pdf - 286 KB

This deliverable outlines the dissemination strategy for the policy recommendations developed in Task 5.3 for Organised Crime and Terrorist Networks.

D7.8 – Final report on Dissemination and Communication activities

pdf - 3 MB

This document summarises the results of the multi-channel and multi-stakeholder dissemination and communication campaign carried out for the PROTON project. The goal of this campaign was to raise awareness and acceptance of the project among its main target stakeholders, such as policy makers, public authorities, security scholars, law-enforcement agencies, researchers and the general public. The activities were mainly performed by youris.com with support from the coordinating team and the other consortium partners. For a detailed description of the adopted dissemination and communication strategy, see Deliverables D7.1 and D7.10.

D7.9 – Exploitation Roadmap 1

pdf - 2 MB

This deliverable outlines the preliminary strategy for the exploitation of the output of project PROTON – the PROTON Wizar.

D7.10 – Dissemination and Communication Plan 2

pdf - 663 KB

This document presents the updated version of PROTON’s communication and dissemination strategy outlined in D7.1. The strategy is about increasing the project visibility by raising awareness of its activities in the community of policy makers, public authorities and security scholars and professionals.

D7.11 – eNewsletter 2

pdf - 812 KB

Read the report about the second project’s eNewsletter. The main aim of the PROTON project newsletters is the engagement of the stakeholders community through a periodic interaction with the project’s contents.

D7.12 – eNewsletter 3

pdf - 1 MB

Read the report about the third project’s eNewsletter. The main aim of the PROTON project newsletters is the engagement of the stakeholders community through a periodic interaction with the project’s contents.

D7.13 – eNewsletter 4

pdf - 872 KB

Read the report about PROTON’s fourth eNewsletter. The main aim of the newsletters is the engagement of the stakeholders community through a periodic interaction with the project’s contents.

D7.14 – eNewsletter 5

pdf - 855 KB

Read the report about PROTON’s fifth eNewsletter. The main aim of the newsletters is the engagement of the stakeholders community through a periodic interaction with the project’s contents.

D7.15 – Exploitation Roadmap 2

pdf - 693 KB

This deliverable titled Exploitation Roadmap 2 continues what has been introduced in the Exploitation Roadmap 1, Deliverable D7.9. The deliverable is divided into four sections. Sections 1 to 4 include the exploitation plan and possible usability of the PROTON final results. Annex A is focused on the manual addressed to policy makers and practitioners who want to set and test in the future policies against potential recruitment of OC and terrorist members. This manual explains all the steps that should be followed by those (policy makers, practitioners, researchers) who choice to replicate the procedure used by PROTON. It could be of some utility for those who want to consider a further implementation of the methodology used by PROTON project, aware of its advantages and limitations. Continuing in this way to fill the knowledge gaps in the area of OC and TN that PROTON project has started to do.

D8.1 – Project Manual

pdf - 2 MB

Main aim of the Project manual is to provide a central reference point and source of information on the day-to-day running and management of PROTON, to provide guidance and tools to assist the task of planning, monitoring and controlling the progress and performance of the project. All the procedures outlined in this document are in accordance with the GA and the CA.

D8.2 – Kick Off Meeting

pdf - 29 MB

The present document contains all the documentation from the first meeting of the PROTON project and the presentation there given by partners.

D8.3 – First Consortium meeting

pdf - 20 MB

This report gathers all the documents related to the First Consortium meeting organised in Jerusalem, on October 16th and 17th 2017. It includes the agenda, the list of participants, the presentations and the minutes of the meeting.

D8.4 – Second Consortium meeting

pdf - 10 MB

This report gathers the documents related to the Second Consortium meeting organised in Milan, on October 15th and 16th 2018. It includes the list of participants, the agenda, the minutes of the meeting and the presentations.

D8.5 – Third Consortium Meeting

pdf - 5 MB

This report gathers all the documents related to the Third Consortium meeting organised in Palermo, on June 17th and 18th 2019. It includes the agenda, the list of participants, the presentations and the minutes of the meeting.